1500 GPM Booster Pump Station, City of Brookfield

Project Information:

The pump station was constructed in 2013 with efficient pumps and automatic controls to replace an old pumping station. Vertical turbine pumps transfer raw water from the City reservoir to the City lake, and it can also pump directly to the City water treatment facility. Operation of the pump station is controlled by the City’s existing SCADA system and has provided the operators much flexibility for supplying raw water to the water treatment facilities.